We are the plumber DHA Phase 7 Extension Karachi homes call for fitting, leaks and tanks. We work in every street of Phase 7 Extension, seven days a week, 8am to 11pm. Call or WhatsApp 0331-3649030.
Naye ghar mein pipe ya pani ka masla ho to pehle call karein. Taps, geysers, pipes and drains are our work in every phase too.
New houses need a look before we can name a price. These are the usual ranges before we see the problem. Calls are taken 8am to 11pm, seven days a week.
| Job | Estimated range in Karachi (Rs) |
|---|---|
| Visit charge | 300 to 500 |
| Tap or mixer fitting, per tap | 500 to 900 |
| Commode fitting | 1,500 to 3,000 |
| Geyser fitting, labour only | 1,000 to 3,500 |
| One blocked drain | 500 to 3,000 |
| Full house fitting or tank work | Told after we see the job |
These are usual ranges, and not a fixed quote. The cost of pipes and parts is extra. Aap batayein kya masla hai, qeemat hum batate hain.
Phase 7 Extension is one of the newer parts of DHA. We work from Badar Commercial in Phase 5.

We cover Phase 7 Extension the same way as any phase. Give us your street, and we come to you.
DHA said in 2012 that a master plan for the Phase 7 extension was ready. Houses were to start in some sectors first, and the rest later. Naye ilaqon mein kaam marhale mein hota hai.
Newer houses often have several bathrooms, a kitchen and a large tank. More fittings bring more joints to check. Naye ghar mein pehle plumbing test karwa lein.
A pipe can be new and still leak at one joint that was rushed. The leak hides behind the finished wall. Tiles lagne se pehle test karwana sasta padta hai.

Clifton Cantonment Board runs the civic side of DHA, and DHA is its administrative body. Lines under the road are their responsibility. From your gate to your tap, the pipe is yours to look after.
Often yes. A house can pass and still have a weak joint. A test with water and pressure shows it before you move in.
Usually not. A new house has no rust or old patches to work around. We test the taps, the tank, the drains and the joints.
New homes need fitting and testing more than repair. We handle both at the same visit charge.
Our pipe line repair team finds the leaking section and fixes it. Taps, mixers and bathroom fittings are done in the same visit.
Our drainage plumber team opens up blocked lines. We take care of geysers too. Ek hi visit mein kai kaam ho jate hain.
Burst pipes and overflowing drains do not keep office hours. Turn off the main valve if water is flooding, and call us right away.
Our same-day emergency service reaches you 8am to 11pm, seven days a week.
New homes need a tank sized for the family, a pump and a float that works. We fit new tanks and repair floats, valves and outlets. Our water tank repair team checks the pump as well.
The first story names the Phase 7 extension. The remaining two cover DHA as a whole, and we say that clearly.
The Express Tribune ran a DHA statement in August 2012. It said the master plan for the Phase 7 extension was ready. People could build in at least two sectors of Phase 7 the next year (The Express Tribune).
The statement said infrastructure in the other sectors would take three years. It is a DHA press release, now 14 years old.
Lesson: in a newer sector, services arrive in stages. Do not wait for the street to be finished. Pehle ghar ke andar ki plumbing theek karwa lein.
We test the pipes inside your house, so it is ready before the street is.
A reader's letter in Dawn on 30 September 2020 said unattended gas leaks had plagued DHA for a year. A relative in Phase 7 had lost several grand trees (Dawn).
The writer said the SSGC office was shut for months. Some households dug pits along the leaking pipes. This is one reader's letter about DHA as a whole.
Lesson: a gas smell in the soil or a garden is a warning. Do not dig. Zameen se gas ki boo aaye to khud pit na khodein.
We pressure test the gas line inside your gate.
The Express Tribune reported in June 2015 that CBC and DHA dug up roads for new water and sewerage lines. Residents got no advance warning (The Express Tribune).
A DHA spokesperson said new supply lines were being laid in Phase 8. Residents asked for at least 15 days of notice. This is a DHA-wide report, now 11 years old.
Lesson: when new lines reach your street, the joint at your gate gets disturbed too. Naye line ke baad gate ka joint dobara check karwa lein.
We check your connection after any new line is laid outside.
and tell us where you are and what is wrong.
which tells us what to check first.
every day of the week, 8am to 11pm.
and not just the leaking spot.
and you pay after the work.
Masla dekhte hain, qeemat batate hain, aur payment kaam ke baad.
Yes, every street in Phase 7 Extension is covered. Name your street, and we will reach you.
Haan, hum naye ghar ki pipe, joints, tank aur nali ko test karte hain. Masla ho to rehne se pehle theek kar dete hain.
Same day in most cases, whatever the day. Call, and we tell you the time straight.
Yes. We fit new tanks and size them with the pump and the pipe. We also repair old tanks.
Yes, it is worth it. A test with water and pressure shows a weak joint before the tiles and paint hide it.
Hum aksar usi din aate hain, koi bhi din ho. Pani bhar raha ho to call karein, hum jaldi pahunchne ki koshish karte hain.
Yes. We lay gas lines and pressure test them, so a small leak cannot hide.
Yes. A single leaking tap gets the same visit as a full fitting job.